Project Overview

Lakewood is beginning the planning process to renovate Becks Pool at Madison Park. The planning will be informed by the objectives outlined in the 2024 Madison Park Master Plan as well as two rounds of community engagement that will be conducted over the coming months of the 2026 summer pool season. Each round of community engagement will center on a public survey followed by an open house event at Becks Pool to discuss current concepts and alternatives for the renovation. The first round of community engagement ran from mid-May through the end of June.

The second round is live now through September 7; scroll down for updated drawings and the new feedback form.

Following the community engagement work this summer, the renovation design will be developed in greater detail over the winter and then put up for public review/comment at City Board/Commission meetings during early Spring 2027. Following final design approval, the project will begin preparation for construction to start soon after the pool season ends in the late summer/early fall of 2027.

Becks Pool Initial Survey

In May and June of 2026, the Planning and Development Department accepted an initial round of public feedback using an online survey. The results can be found here:

Becks Pool Round 2 Survey Results

Project proposal drawings can be found below.

Proposal Drawings

Click the images below to view full-size versions.

Round 2 - August/September 2026

Drawing of the proposed Becks Pool redesign, Option C. This design features a lap pool separated from family/child features, a separate zero entry area that connects to the current channel (lazy river), concessions, shaded areas, slides, a diving area in the lap pool, and a splash pad accessible from Madison Park.
Becks Pool Option C
Architectural drawing of the proposed Becks Poolhouse. If you would like assistance or more details, please contact the Planning Department at (216) 529-6630.
Becks Poolhouse Drawing

Round 1 - July 2026

Option A for the Becks Pool Renovation. Features a family area with current channel separated from the lap pool. Plunge pool (water slide area) connects with the lap pool. Also features a splash pad (outside the pool area and open to the public), shaded grass area, food tables, and chairs.
Becks Pool Option A.
Option B for the Becks Pool Renovation. Features a family area with current channel and connects to the plunge pool (waterslide area). Lap pool is fully separated. Also features a splash pad (outside the pool area and open to the public), shaded grass area, food tables, and chairs.
Becks Pool Option B.
Architectural drawing of the renovated pool house with text describing the features. Please reach out to the Planning Department for more information.
Becks Pool Poolhouse architectural drawing.